A Design/Build project, the H/MC-130 Fuel Cell Maintenance Facility is a Hangar with 31,942 square feet that will accommodate a C-130 or two CV22 airplanes. The Hanger space has a very high bay with highly sophisticated mechanical and electrical systems, and also has an expansion foam system in the Hangar bay. This facility also includes offices, conference room, break room, CTK room, communication room, fire protection equipment room, toilet/locker/shower rooms, janitor room, boiler room and mechanical/electrical rooms. This facility includes a fall protection system and breathing air drops to the aircraft fuel cells. This facility is LEED Silver accredited. Parking and landscaping were also provided. This project also includes an Armament Shop with 10,760 square feet and an addition to existing Corrosion Control Facility with 3,763 square feet.