Work included site work, installation of three 10,000 barrel tanks, tank foundations, new dike containment walls, new pumping and filtration systems and pipeline inbound filtration equipment. Truck off loading stations, refueler-loading positions, and a new four position remote loading rack. Approximately one mile of 12-inch dedicated fuel line from the storage facility to the new load racks. Line included tunneling under existing runways. Project also included a new Fueling and Operations Building, providing administrative offices, maintenance bays for refuelers and other ground service equipment. The building included concrete masonry and steel construction with a standing seam metal roof system, exterior finish systems, all finishes with fueling system controls and terminal management system.